Bài giảng Well drilling engineering - Chapter 1: Overview of Rotary Drilling (Part 1) - Đỗ Quang Khánh

Contents

Introduction

Drilling Team

Steps to Drill a Well

Drilling Rigs

Offshore Drilling

Drilling Cost Analysis (Drilling Economics)

ppt24 trang | Chia sẻ: Thục Anh | Ngày: 21/05/2022 | Lượt xem: 268 | Lượt tải: 0download
Bạn đang xem trước 20 trang nội dung tài liệu Bài giảng Well drilling engineering - Chapter 1: Overview of Rotary Drilling (Part 1) - Đỗ Quang Khánh, để xem tài liệu hoàn chỉnh bạn click vào nút DOWNLOAD ở trên
1 Well Drilling Engineering Overview of Rotary Drilling Dr. DO QUANG KHANH Contents Introduction Drilling Team Steps to Drill a Well Drilling Rigs Offshore Drilling Drilling Cost Analysis (Drilling Economics) 2 Fig: Role of drilling in field development Introduction: The life of an oil or gas field can be sub-divided into the following phases: • Exploration • Appraisal • Development • Maintenance • Abandonment Fig. 1.3 - Typical drilling rig organization Personnel involved in drilling a well Fig. 1.4 The rotary drilling process Steps to Drill A Gas/Oil Well 1. Complete or obtain seismic, log, scouting information or other data. 2. Lease the land or obtain concession. 3. Calculate reserves or estimate from best data available. 4. If reserve estimates show payout, proceed with well. 5. Obtain permits from conservation/ national authority. Steps to Drill a Well - cont’d 6. Prepare drilling and completion program. 7. Ask for bids on footage, day work, or combination from selected drilling contractors based on drilling program. 8. If necessary, modify program to fit selected contractor equipment. Steps to Drill a Well - cont’d 9. Construct road, location/platforms and other marine equipment necessary for access to site. 10. Gather all personnel concerned for meeting prior to commencing drilling (pre-spud meeting) 11. If necessary, further modify program. 12. Drill well. Steps to Drill a Well - cont’d 13. Move off contractor if workover unit is to complete the well. 14. Complete well. 15. Install surface facilities. 16. Analysis of operations with concerned personnel. Drilling Operations Field Engineers, Drilling Foremen A. Well planning prior to SPUD B. Monitor drilling operations C. After drilling, review drilling results and recommend future improvements - prepare report. D. General duties. What are the well requirements? Objectives, safety, cost Making a Connection Making a Trip Making a mouse hole connection Making a mouse hole connection - cont’d Single Added. Ready to Drill Moving Kelly to Single in Mousehole Stabbing the Pipe Use Elevators for tripping Making a trip Put Kelly in Rathole Why trip? Making a trip - cont’d Tripping one stand at a time 60-90 ft Fig. 1.5 Classification of rotary drilling rigs Noble Drilling’s Cecil Forbes A Jack-Up Rig Sonat’s George Washington A Semi-Submersible Rig Zapata’s Trader A Drillship Deep Water Development Options SUBSEA COMPLETIONS FIXED PLATFORMS COMPLIANT TOWERS FLOATING PRODUCTION SYSTEMS TENSION LEG PLATFORMS TENSION LEG PLATFORM Shell’s Auger Tension Leg Platform Shell’s Bullwinkle World’s tallest offshore structure 1,353’ water depth Production began in 1989 45,000 b/d 80MM scf/d

Các file đính kèm theo tài liệu này:

  • pptbai_giang_well_drilling_engineering_chapter_1_overview_of_ro.ppt
Tài liệu liên quan