 Chapter 12 shows how standard costs and variances are used for decision control.

 Chapter 4 discussed the decision control process.

 Chapter 6 showed how budgets are used in decision control.

 

 

ppt21 trang | Chia sẻ: hongha80 | Lượt xem: 627 | Lượt tải: 0download
Bạn đang xem trước 20 trang nội dung tài liệu Bài giảng môn Kế toán, kiểm toán - Chapter twelve: Standard costs: direct labor and materials, để xem tài liệu hoàn chỉnh bạn click vào nút DOWNLOAD ở trên
Standard Costs: Direct Labor and MaterialsChapter TwelveCopyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved.McGraw-Hill/IrwinConnection to Other Chapters Chapter 12 shows how standard costs and variances are used for decision control. Chapter 4 discussed the decision control process. Chapter 6 showed how budgets are used in decision control.12-2Standard Cost Definition: The expected cost that is reasonably required to achieve a given objective under specified conditions.Used for Decision Management: Standards can be better predictors of future costs than actual past costs.Can be used in product pricing, bidding, and outsourcing decisions.Used for Decision Control:Set performance expectations or benchmarks for the costs of products, processes, or sub-components.Variances from standards get attention of managers.12-3Setting and Revising StandardsSetting standards depends on specialized knowledge.Price standards from economic forecastsQuantity standards from engineering studiesChoosing between tight and loose standardsTight standards motivate higher performance (decision control).Loose standards allow more discretion (decision management).Standards are usually set once a year.Frequent revision would reduce incentives to control costs.12-4Target Costing Target costing is a technique used for new product planning.1. Market planners begin with selling price required to achieve a desired market share.2. Selling price Desired profit = Total target cost3. Assign portion of total target costs to marketing, engineering, and manufacturing departments.4. Redesign product and techniques to achieve target.12-5Purpose of Variances Variances measure the difference between actual and standard costs.Favorable (F) variance, if actual standardDecision controlVariances alert managers to deviations from plan.Performance rewards may be based on minimizing variances.12-6Variance ComputationSymbols: T= Total; A = Actual; S = Standard; P = Price; Q = QuantityTotal Variance = Actual Cost minus Standard cost TV = (AQ  AP) - (SQ  SP) = (AQ  AP) + [ - (SP AQ) + (SP  AQ)] - (SQ  SP) = [(AQ  AP) - (SP  AQ)] + [(SP  AQ) - (SQ  SP)] = [AQ  (AP - SP)] + [(AQ - SQ)  SP] = PV + QV Total Variance = Price Variance + Quantity VarianceSee Self-Study problem.12-7Direct Labor VarianceSymbols: a = Actual; s = Standard; H = Hours; W = Wage rate per hourTotal Flexible budget Totalactual based on standard cost actual input cost(Ha  Wa) (Ha  Ws) (Hs  Ws) |_______________________| |______________________| [Ha  (Wa - Ws)] [(Ha - Hs)  Ws] Wage variance Efficiency variance |_________________________________________________| [(Ha  Wa)  (Hs  Ws)] Total labor varianceSee Figure 12-1.12-8Interpreting Direct Labor Variance Large variances in either direction indicate performance is not as planned, due to either poor planning, poor management, or random fluctuation. Unfavorable wage variance Workers were not available at lower rates Unfavorable wage variance with favorable efficiency variance Higher-paid workers performed work more efficiently Favorable wage variance with unfavorable efficiency variance Lower-paid workers performed work less efficiently12-9Direct Materials Variance - current use In this case, no direct materials remain in ending inventories.Total Flexible budget Totalactual based on standardcost actual use cost(Qa  Pa) (Qa  Ps) (Qs  Ps) |__________________| |_____________________| [Qa  (Pa - Ps)] [(Qa - Qs)  Ps] Price variance Quantity variance |____________________________________________| [(Qa  Pa)  (Qs  Ps)] Total materials varianceSee Figure 12-2.12-10Direct Materials Variance - no current use In this case, all purchased materials remain in ending inventories. Recognize material purchase price variance at time of purchase rather than waiting until materials are used.Qb = Actual quantity boughtTotal Flexible budget actual based on cost actual purchased(Qb  Pa) (Qb  Ps) |_______________________| [Qb  (Pa - Ps)] Price variance See Figure 12-3.12-11Direct Materials Variance - current and future useTotal actual Flexible budget based cost on actual purchased(Qb  Pa) (Qb  Ps) |_____________________| [Qb  (Pa - Ps)] Price variance Flexible budget based Total standard on actual use cost (Qa  Ps) (Qs  Ps) |_______________________| [(Qa - Qs)  Ps] Quantity variancePrice variance recognized at time materials purchased.Quantity variance recognized at time materials are used.12-12Timely Reporting of Materials Price Variance is Important!Managers can act quickly to mitigate or capitalize on price changes.For example, if a raw materials price rises, managers might want to use less of the more expensive material and more of the relatively less expensive material, if such a substitution is possible.And/or management might want to raise the selling price for the final products.12-13Risk Reduction and Standard CostsRisk reduction is a service individuals are willing to buy from financial markets.Standard costs remove price and efficiency fluctuation from performance measures of downstream users.Downstream users bear less risk because they know the standard costs they will be charged in the future.12-14Incentive Effects: Build Inventories Rewarding purchasing managers for favorable direct materials price variances creates an incentive for them to buy large quantities when price discounts are offered for high-volume purchases. Penalizing production managers for unfavorable labor efficiency variances encourages keeping labor busy producing more. Mitigation of inventory building incentive Charge purchasing department for cost of holding inventory. Just-in-time (JIT) purchasing and production policies12-15Incentive Effects: ExternalitiesPurchasing externalities on productionPurchase cheaper substandard materials.Purchase price variance is favorable.Unusable material results in unfavorable material quantity variance.Production externalities on purchasingShort lead times on requisitions lead to higher purchase prices.Requesting special orders for materials leads to higher prices.See self-study problem, part b.12-16Incentive Effects: Discourage Cooperation Evaluating performance evaluation on individual's variancesEmphasizes individual instead of team effortsReluctance to help others look goodSolution:Base reward system on both individual and departmental (team) variances.Too much weight on teamwork can lead to shirking (free-rider problem).12-17Incentive Effects: Mutual MonitoringMutual monitoringMethod where managers or employees at the same level monitor each other’s performanceNoninsulating allocations encourage mutual monitoring (see Chapter 7)Example when performance evaluation of both purchasing and production managers depends on both material price and quantity variances.Purchasing manager wants to help production manager become more efficient in material usage.Production manager wants to schedule requisitions to help purchasing manager buy materials at better prices.12-18Incentive Effects: SatisficingSatisficing behavior: Managers have incentives to achieve standard but go no further.Firm value would increase if managers attemptedcontinuous improvement beyond standardinnovate to meet competitive threats12-19Disposition of Standard Cost Variances Alternatives for disposing (writing off) standard cost variances are similar to the alternatives for disposing of over/underabsorbed overhead (Chapter 9).1. Writing all variances off to cost of goods sold (expense)2. Allocating between costs of goods sold (expense) and work-in process and finished good inventory3. Recalculating the cost of each job The above alternatives are listed in order of increasing complexity.12-20Cost of Maintaining Standard Cost SystemStandard cost systems require:Detailed standards for each labor and material inputUpdating for technological and price changesTime to investigate and explain variancesStandard cost systems are less likely to be used when:Direct labor cost is a small portion of total costRapid change in production processes or new product introductions require frequent revisions of standards12-21

Các file đính kèm theo tài liệu này:

  • pptspptchap012_1858.ppt